[1]
M. Ištvanović and S. Tvorić, “PROCEDURE AND REQUIREMENTS FOR THE DEVELOPMENT OF AN ELECTRICAL ENGINEERING PROJECT DTS 10(20)/0.4 KV”, pid, vol. 12, no. 03, Mar. 2025.